Lingoda Sprint Dates: October 2026 Calendar and US Time-Zone Checks
The verified October cohort runs from October 20 to December 18, 2026
The October 2026 Sprint rules list an enrollment deadline of October 13, 2026 at 09:59, labeled CET. The class period begins October 20 and ends December 18. These are dates for that named cohort, checked on October 12, 2026—not a rolling calendar of every Sprint offered during the year.

On this page
The deadline’s CET label needs clarification before a precise US conversion. European locations such as Berlin are normally observing summer time on October 13, while CET denotes standard time. Treating those two meanings as interchangeable creates a one-hour difference. We therefore do not publish a single ET or PT enrollment cutoff as confirmed.
Dates stated in the cohort PDF
| Event | Date or period as stated | What to put in your calendar |
|---|---|---|
| Enrollment closes | October 13, 2026, 09:59 (CET) | Confirm the intended zone or UTC offset before using a US conversion. |
| Promotion starts | October 20, 2026, 00:00 | First permitted class date; confirm the applicable time-zone boundary. |
| Promotion month 1 | October 20–November 18, 2026 | Count the first 15 or 30 qualifying classes here. |
| Second payment and credits | November 11, 2026 | Check payment method and the second credit allocation. |
| Promotion month 2 | November 19–December 18, 2026 | Count the second 15 or 30 qualifying classes here. |
| Promotion ends | December 18, 2026, 23:59 | Final attendance boundary and rollover-cancellation limit under section 7.4. |
The first payment is due on registration. Second-month credits arriving on November 11 do not move the beginning of the second attendance period from November 19. Payment dates, credit-allocation dates and class-counting dates serve different purposes.
How to resolve a US deadline safely
Ask Lingoda to confirm the enrollment deadline as a UTC timestamp or a named time zone with the date. A useful question is: “For the October 20, 2026 Sprint, does October 13 at 09:59 CET mean UTC+01:00, or local Berlin time? Please confirm the equivalent deadline in America/New_York.” Use your own location if different.
Once that is clear, enter a date-specific calendar event in the source zone and view it in your local zone. Use location names such as America/New_York or America/Los_Angeles. Writing EST or PST all year can hide daylight-saving changes; ET and PT are useful general labels, but an exact deadline still needs the date and location.
If you travel, keep the original-zone event as well as the local display. Check the actual booked class date after arrival. Changing the device clock should not be treated as changing which promotion day a class counts toward.
The deadline is not the only date that matters
Regular Sprint requires 15 qualifying classes in each promotion month, while Super Sprint requires 30. “Finish early” is not a useful general strategy: the October rules allow only one class per day, and regular Sprint has an additional five-per-week cap. The rules guide explains these limits.
Book only classes that fit the applicable period and use the right Sprint credits. A cancellation deadline belongs to each individual class, not to the end of the promotion. For this cohort it is 168 hours before class, with the separate immediate 30-minute cancellation window described in the rules.
Add the after-Sprint reminders separately
For this cohort, the PDF permits canceling post-Sprint rollover in the second promotion month up to the end date. Do that early enough to check the result, rather than relying on a reminder at 23:59.
Section 6 says Lingoda will email reward eligibility within two weeks after the end date and pay the reward no later than 45 days after the end date. Keep those relative deadlines with the contract. They are different from a cancellation refund and do not resolve the reward-percentage disagreement described in the cashback guide.
For any later cohort, open the current official Sprint page and obtain its rules. Replace every date in your calendar from that agreement; do not reuse October’s payment or rollover dates simply because the product name is unchanged.
